Kenco-engineering Accu-Rate Pump Setting Gauge Manual de usuario

Busca en linea o descarga Manual de usuario para Zapatillas Kenco-engineering Accu-Rate Pump Setting Gauge. Kenco Engineering Accu-Rate Pump Setting Gauge User Manual Manual de usuario

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 2
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 0
KENCO ACCU-RATE PUMP SETTING GAUGE®
INSTALLATION AND OPERATING INSTRUCTIONS
Install pipe fittings into gauge by rigidly clamping the END PLATE that is to have piping
installed. Tighten the pipe fittings into the threaded connection of this END PLATE.
GLASS SIGHT TUBE will BREAK if the END PLATE is not HELD RIGIDLY to eliminate
any TWISTING.
GAUGE MUST BE INSTALLED SO GRAVITY WILL FILL THE GAUGE.
To check pumping rate, open VALVE “B” to fill the pump setting gauge. When the
gauge is filled, close VALVE “A” for one minute and note the level in the gauge at the
beginning of the test and at the end of the test. Count the number of marks on the rate
scale that the level dropped. This is the pump rate.
58270
(12-22-11)
Vista de pagina 0
1 2

Indice de contenidos

Pagina 1 - (12-22-11)

KENCO ACCU-RATE PUMP SETTING GAUGE® INSTALLATION AND OPERATING INSTRUCTIONS Install pipe fittings into gauge by rigidly clamping the END PLATE that

Pagina 2

KENCO ACCU-RATE PUMP SETTING GAUGE® Model PSG0180, PSG0404, PSG0720, PSG1620 and PSG2880 Sight Tube Installation Instructions 1. Apply a small amou

Comentarios a estos manuales

Sin comentarios